Home > Structures > Indonesia2
Truss Bridges / Indonesia2
Jawa South Line WW Truck (Erection Work), Indonesia
Jawa South Line WW Truck (Erection Work), Indonesia
Type | Truss, I Girder |
Bridge Length | 20 to 45 m |
Width | 4.7 m |
Steel Weight | 1,100 t |
Completed | 2006 |
Jawa North Line Railway Bridge, Indonesia
Jawa North Line Railway Bridge, Indonesia
Type | Truss, I Girder |
Bridge Length | 20 to 45 m |
Width | 4.7 m |
Steel Weight | 500 t |
Completed | 2000 |