Item | Country | Type | Length (m) |
Width (m) |
Steel- Weight(m.t.) |
Completed |
---|---|---|---|---|---|---|
Mandaue Opon Bridge | Philippines | 3 - span continuous truss, 3 - span continuous plate, girder and simple beam | 860.0 | 12.7 | 2,100 | 1970 |
Arkansas River Bridge | U.S.A. | 3 - span continuous composite girder, 3 and 4 - span continuous plate girder | 1,518.5 | 15.5 | 12,000 | 1972 |
Maroon Bridge and Others | lran | Composite girder and through truss | 780.0 | 8.5 | 1,900 | 1972 |
Basrah - Zubair Swing Bridge for Road | Iraq | Plate girder | 93.8 | 18.0 | 1,170 | 1978 |
Basrah - Zubair Swing Bridge for Railway | Iraq | Through truss | 74.4 | 9.9 | 930 | 1978 |
Panjang - Sribhawono Highway Bridge (South Sumatera) | Indonesia | Warren truss | 62.0 | 8.0 | 186 | 1979 |
Ci - Sadane Bridge | Indonesia | 6 - span composite plate girder | 184.6 | 12.0 | 730 | 1982 |
Kuparuk River Crossing Bridge | U.S.A. | Simple truss (Pipeline) | 3,170 | 1982 | ||
Columbia River Railway Bridge | U.S.A. | 3 - span simple truss | 228.1 | 1,260 | 1982 | |
Jakarta Merak Road Bridge | Indonesia | I Girder | 184.6 (6@30) |
12.0 | 374+374 | 1982 |
Cipatiku Bridge | Indonesia | Warren truss | 103.4 (57.7+43.5) |
7.9 | 168 | 1983 |
Chibitan Road Bridge | Indonesia | Warren truss | 44.4 | 5.5 + 1.0 | 74 | 1983 |
Cilangkap Road Bridge | Indonesia | Simple truss | 43+90+43 | 7.9 | 492 | 1983 |
Tripa de Gallina Bridge | Philippines | Simple truss | 36.38, 49.48 |
198 | 1983 | |
Railway Bridge for Columbia Cerrejon Coal Project | Columbia | H - beam girder | 2,650 | 1983 | ||
Railway Bridge for Indonesia | Indonesia | Through Girder, Deck Girder, Open Truss, Through Truss, 25 | 6.5 to 50.0 | 534 | 1983 | |
Chiranan Road Bridge | Indonesia | Simple Composite H Girder | 20.0 | 27 | 1984 | |
Taba Bridge | Indonesia | Lattice truss (Temporary) | 76.0 | 4.5 | 251 | 1984 |
Enim River Bridge | Indonesia | 4 - Span Continuous Composite girder | 180.0 (40+40+ 60+40) |
360 | 1984 | |
Abha - jizan Bridge | Saudi Arabia | Continuous plate girder | 230.0 | 12.6 | 1,160 | 1984 |
Road Bridge for Feeder Road Project No. 29 | Saudi Arabia | Composite plate girder | 11.6 | 2,030 | 1984 | |
Flathead River Bridge | U.S.A. | Simple plate girder | 282.0 | 700 | 1985 | |
Kepong Interchange | Malaysia | Composite plate girder | 283.0, 412.6 |
8.4, 11.9 | 2,300 | 1986 |
Greater New Orleans No. 2 Bridge Approaches | U.S.A. | Continuous plate girder | 570.0 | 10 to 21 | 2,100 | 1986 |
Snohomish River Railway Bridge | U.S.A. | Plate girder | 38.0, 45.6 | 330 | 1988 | |
Rural Road Bridge (Phase I ) | Philippines | H - beam girder | 20 to 25 | 8.0 | 450 | 1988 |
Rural Road Bridge (Phase II ) | Philippines | Plate girder and H - beam girder | 24.5 to 107.1 | 7.6 | 1,040 | 1989 |
Rural Road Bridge (Phase I ) | Thailand | Plate girder and H - beam girder | 11 to 23 | 5.6, 8.6 | 340 | 1990 |
Copan Bridge | Honduras | H - beam girder | 54.0 | 4.0 | 30 | 1990 |
Taue Bridge | Senegal | Plate girder | 80.0 | 3.5 | 40 | 1990 |
Bulsa River Bridge | Philippines | H - beam girder | 16 to 171.8 | 180 | 1990 | |
Rural Road Bridge | Guatemala | H - beam girder and plate girder | 40 to 75 | 190 | 1990 | |
Rural Road Bridge | Thailand | H - beam girder | 50 (15+20+15) |
7.0 | 450 | 1991 |
Bridge in Kathmandu Valley | Nepal | Plate girder and H - beam girder | 22 to 132.7 | 5.5 to 8.5 | 300 | 1991 |
Lungga Bridge | Solomon Islands | 3 - span continuous plate girder | 290 | 1991 | ||
El Zapote Bridge | Guatemala | Truss | 50.0 | 120 | 1992 | |
Rural Road Bridge (Phase III ) | Philippines | Plate girder and H - beam girder | 15 to 96 | 8.3 | 510 | 1992 |
Chongwe Bridge | Zambia | PABRIS (Portable Bridge) A - type | 720 (3@240) | 4.0 | 110 | 1992 |
Kafue Road Bridge | Zambia | 4 - span continuous plate girder | 161.2 | 330 | 1993 | |
Bridge in Kathmandu Valley (Phase II ) | Nepal | Plate girder and H - beam girder | 22 to 134 | 220 | 1993 | |
Chroy Changwar Bridge | Cambodia | Box girder | 265 (65+135+65) |
13.0 | 520 | 1993 |
Rural Road Bridge (Phase IV ) | Philippines | H - beam girder and plate girder | 20.0 | 870 | 1993 | |
Jangsa Bridge | Bhutan | H - beam girder | 100.0 | 8.3 | 210 | 1993 |
Rural Road Bridge (Phase I ) | Solomon Islands | Continuous plate girder | 56.0, 72.0 | 6.9 to 10.4 | 170 | 1994 |
Rural Road Bridge (Phase II ) | Solomon Islands | Continuous plate girder and H - beam girder | 20 to 72 | 5.7 to 10.9 | 210 | 1995 |
Rural Road Bridge (Phase I ) | Bangladesh | Truss | 14.6 to 24.3 | 3.4 | 300 | 1995 |
Rural Road Bridge (Group II ) | Philippines | Continuous plate girder and H - beam girder | 20.4 to 93.3 | 7.3 to 8.9 | 310 | 1996 |
Rural Road Bridge (Phase II ) | Bangladesh | Truss | 19.8 to 24.6 | 3.7 | 260 | 1996 |
Rural Road Bridge (Group I ) | Philippines | Plate girder and H -beam girder | 19.4 to 38.6 | 8.9 | 492 | 1996 |
Rural Road Bridge (Phase I ) | Vietnam | Plate girder | 21.5 to 64.5 | 5.5 to 6.5 | 170 | 1996 |
Kap Shui Mun Bridge | Hong Kong | Composite Cable-stayed and PC Box girder | 750 (2@80+430 +2@80) |
35.0 | 4,500 (Total 9,000) |
1997 |
Jawa North Line, Package1, A | Indonesia | Construction girder | 10.5 to 50.0 | 449 | 1998 | |
Jawa North Line, Package1, B | Indonesia | Bearings | 34 | 1999 | ||
Umi Bridge | Papua New Guinea | Continuous I Girder | 160.0 | 9.4 | 402 | 1999 |
Jawa North Line, Package1 | Indonesia | Truss, I Girder | 25 to 45 | 4.7 | 550 | 2000 |
Narthupana Bridge | Sri Lanka | Arch | 75.0 | 13.0 | 341 | 2000 |
PNG Relon Bridge(Additional parts) | Papua New Guinea | Continuous I Girder | 50.0 to 144.0 | 4.5 to 7.5 | 9 | 2001 |
Portable Steel Bridges for Feeder Roads | Bangladesh | Simple Truss | 29.9 to 98.8 | 3.5 | 490 | 2001 |
Bridges Along Rural Roads in Northern Luzon | Philippines | Simple I Girder | 24.7 to 30.5 | 8.8 | 380 | 2002 |
Portable Steel Bridges for Feeder Roads | Bangladesh | Truss | 19.8 to 74.1 | 3.5 | 543 | 2002 |
Reconstruction of Bridges in Mekong Delta Area | Vietnam | Simple I Girder, H -beam Girder | 21.1 to 99.2 | 4.5 to 5.5 | 809 | 2002 |
Steel Bridges for Roads in Rural Areas | Bangladesh | Truss | 14.9 to 24.7 | 3.7 to 8.4 | 252 | 2002 |
Reconstruction of Bridge, Phase 1 | Bhutan | Pony Truss, Langer | 43.0 to 95.2 | 6.3 to 8.3 | 752 | 2003 |
Jawa North Line, Package2 | Indonesia | Truss | 880 | 2003 | ||
Reconstruction of Gampola Bridges and Muwagama Bridge | Sri Lanka | Langer | 99.0 | 12.4 | 534 | 2003 |
Steel Bridges for Roads in Rural Areas | Bangladesh | Truss | 10.0 to 19.8 | 3.7 | 179 | 2003 |
The Central Area of Viet Nam Steel Girder Procurement of 15 Bridges (South lot) | Vietnam | Simple I Girder, H -beam Girder | 30.1 to 72.2 | 4.5 to 5.5 | 626 | 2003 |
Jawa Southline WW Truck (Erection Work) | Indonesia | Truss, I Girder | 20 to 45 | 4.7 | (1,100) | 2006 |
Nihonbashi Repair Work (Chroy Changwar Bridge) | Cambodia | Repair | 265.0 | 13.0 | 58 | 2006 |
Repair on Existing Maruwai Bridge in Central Kalimantan(1) | Indonesia | Repair | 106.0 | 9.5 | 14 | 2006 |
Repair on Existing Maruwai Bridge in Central Kalimantan(2) | Indonesia | Repair | 106.0 | 9.5 | 10 | 2007 |
Repair on Existing Maruwai Bridge in Central Kalimantan(3) | Indonesia | Repair | 106.0 | 9.5 | 1 | 2007 |
Reconstruction of Bridge, Phase 2 | Bhutan | Langer | 180.0 to 283.0 | 5.5 to 6.0 | 742 | 2007 |
Ciputat F lyover | Indonesia | 3-span Simple 4 Box Girder | 102 (3@34) | 19.6 | 589 | 2008 |
Portable Steel on Upazila and Union Roads | Bangladesh | Simple Truss | 19.8 to 29.5 | 3.7 to 3.8 | 178 | 2008 |
National Expressway No. 6, C606A Viaduct project (Erection Work) | Taiwan | Steel Deck Box Girder | 838.5 (54.5+92+4 @150+92) |
27.4 | 3,332 (Total 17,720) |
2008 |
Incheon Bridge (Cable Buffer and Lease & Erection Work SV) | Korea | Cable-stayed | 1,480 (340+800+ 340) |
33.7 | (28,000) | 2009 |
Stonecutters Bridge | Hong Kong | Hybrid Cable-stayed | 1,596 (289+1, 018+289) |
53.3 | 8,633 (Total 43,165) |
2009 |
Daraha Bridge (Erection Work Superintendence) | Indonesia | Truss | 45.0 | 6.5 | (80) | 2009 |
Railway Bridges, No.1 -5 (Erection Work by YCC ) | Uzubekistan | Truss | 172.4 to 178.4 | 4.2 | (4,767) | 2009 |
Cantho Bridge (Erection Work) | Vietnam | Hybrid Cable-stayed | 1,010 (230 +550+230) |
26.0 | (2,700) | 2010 |
Maruwai New Bridge | Indonesia | Truss + I Girder | 110 (80+30) | 9.0 | 463 | 2010 |
Mola Bridge | East Timor | Truss | 51.5+2@56.7+51.5 | 7.0 | 416 | 2011 |
Reconstruction of Bridge, Phase 3 | Bhutan | Langer,Simple I Girder | 70.0, 45.0 | 6.0 | 251 | 2011 |
Hanoi-Ho Chi Minh City Railway Line Bridges Safety Improvement Projects, CP2 | Vietnam | Truss, I Girder, 10 | 43.0 to 62.3, 11.9 to 12.8 |
4.8, 1.5 | 3,150 | 2012 |
Tanjung Priok Access Road Construction Project (Phase 2) Package4 Section N-S | Indonesia | Continuous Box Girder Simple Box Girder |
55 to 253.3 | 9.5 | 1,900 | Under Const. |
Hanoi-Ho Chi Minh City Railway Line Bridges Safety Improvement Projects, CP1D | Vietnam | Truss I Girder | 43.0 to 62.3, 9.4 to 11.9 |
4.8, 2.0 | 1,310 | Under Const. |
Steel Frames
Item | Country | Type | Length (m) |
Width (m) |
Steel- Weight(m.t.) |
Completed |
---|---|---|---|---|---|---|
Crane girder | Argentina | Steel Frames | 900 | 1958 | ||
Mixta Iran Works | Argentina | Steel Frames | 2,600 | 1960 | ||
Peru Hydro-power Plant | Peru | Steel Frames | 50 | 1965 | ||
Wisma Nusantara Building | Indonesia | Steel Frames | 4,200 | 1966 | ||
Sa-Le Fertilizer Plant | Myanmar | Steel Frames | 1,200 | 1968 | ||
Musoshi Mine | Zaire | Steel Frames | 2,500 | 1971 | ||
Ammonia Plant | India | Steel Frames | 350 | 1971 | ||
Plaza Hotel | Hong Kong | Steel Frames | 5,500 | 1972 | ||
Ammonia Plant | Germany | Steel Frames | 3,800 | 1973 | ||
Ammonia Plant | Former U.S.S.R. | Steel Frames | 3,600 | 1974 | ||
Synthetic Rubber Plant | Korea | Steel Frames | 2,000 | 1974 | ||
Urea Plant | Indonesia | Steel Frames | 700 | 1974 | ||
Ammonia Plant | China | Steel Frames | 4,000 | 1975 | ||
Air-cooled T/C of Ammonia Plant | Former U.S.S.R. | Steel Frames | 800 | 1975 | ||
P.I.C. Isfahan Work | Iran | Steel Frames | 4,600 | 1975 | ||
Pressure Vessels | Algeria | Miscellaneous | 110 | 1975 | ||
Pyramid Dynamic Mast and Substructure for Drilling Rig | U.S.A. | Miscellaneous | 400 | 1975 | ||
Luxury Hotel | Bahrain | Steel Frames | 3,000 | 1976 | ||
Integrated Maintenance Shop | Algeria | Steel Frames | 10,000 | 1976 | ||
I.J.P.C. Olefi n Plant | Iran | Steel Frames | 1,800 | 1977 | ||
Power Station | Cuba | Steel Frames | 760 | 1977 | ||
Steel Column for Subway Station | Hong Kong | Miscellaneous | 2,200 | 1977 | ||
Air Coolers | Saudi Arabia | Steel Frames | 720 | 1978 | ||
The Arab Otsuka Pharmaceutical Factory | Egypt | Steel Frames | 430 | 1978 | ||
Oil Gas Plant | Former U.S.S.R. | Steel Frames | 2,620 | 1978 | ||
I.J.P.C. Aromatics Plant | Iran | Steel Frames | 1,120 | 1978 | ||
Non-process Buildings of F.C.C. & Aromatics Plant | Germany | Steel Frames | 1,020 | 1978 | ||
Hassi R'mel Gas Recycling Plant MPP- IV | Algeria | Steel Frames | 720 | 1978 | ||
Work Shop | Algeria | Steel Frames | 4,300 | 1978 | ||
Desalination Plant | U.A.E. | Steel Frames | 154 | 1978 | ||
Air Coolers | Venezuela | Steel Frames | 520 | 1978 | ||
H.H. the Amir's Residence | Bahrain | Steel Frames | 880 | 1979 | ||
Cracking Heater of Ethylene Plant | China | Steel Frames | 4,900 | 1979 | ||
Crane Girder for China Steel | Taiwan | Steel Frames | 2,790 | 1980 | ||
F.C.C. & Aromatics Plant | Germany | Steel Frames | 12,460 | 1980 | ||
Structural Steel for Wilshire House | U.S A. | Steel Frames | 2,700 | 1981 | ||
Structural Steel for Oil Pipe Rack | Saudi Arabia | Steel Frames | 4,790 | 1981 | ||
Polyvinyl Chloride Plant | China | Steel Frames | 185 | 1981 | ||
Steel Box Column for Dae Han Insurance Building | Korea | Steel Frames | 1,520 | 1981 | ||
Steel Box Column for Cheung Kong Building | Hong Kong | Steel Frames | 1,600 | 1982 | ||
Arzew Liquefi ed Petroleum Gas Plant | Algeria | Steel Frames | 2,160 | 1982 | ||
Tower & Youth Training Center | Myanmar | Steel Frames | 570 | 1986 | ||
Shenzhen Development Center | China | Steel Frames | 3,650 | 1986 | ||
Structural Steel for C.U.F. Plant | Bangladesh | Steel Frames | 610 | 1986 | ||
Steel Structure of Conductor Guide Frame for Shell Bullwinkle | U.S.A. | Miscellaneous | 770 | 1986 | ||
A.V.C. Project | Indonesia | Steel Frames | 210 | 1996 | ||
Wayang Windu Geothermal Power Plant Project | Indonesia | Steel Frames | 2,400 | 1999 | ||
Callide Power Plant Project | Malaysia | Steel Frames (Backstay ) | 600 | 1999 | ||
Hong Kong Jocky Club Sha Tin Racecourse Parade Ring Redevelopment Project | Hong Kong | Miscellaneous (Roof Movable system) | 2004 | |||
Structural Steel for Karebbe Hydroelectric Project | Indonesia | Spillway Bridge, Hoist Flame etc | 52 | 2011 |